You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Joging Track di Waduk Setu Rampung

Setu Reservoir is Now Equipped with Jogging Track

Jogging track construction at Setu Reservoir, Setu Urban Village, Cipayung, East Jakarta has been completed on Wednesday (7/22). According to plan, East Jakarta Mayor, Muhammad Anwar will inaugurate this sport facility by the end of July.

We deploy 25 joint personnel from SDA and PPSU for the construction

Setu Urban Village Head, Jenuri conveyed, its construction has been started since Friday (7/17). This jogging track is as long as 200 meters with width 1 meter and beautified with decorative plants and vegetables on the sides of the track.

"We deploy 25 joint personnel from SDA and PPSU for the construction," he conveyed, Thursday (7/23).

Three Reservoirs in East Jakarta Designed for Ecotourism

In making the jogging track, his side used material given by urban village side and TNI AD Teritorrial Center (Puster).

He expected this sport facility can make happier people who visit Setu Reservoir.

"We keep reminding Setu Reservoir visitors to comply with health protocols," he asserted.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2631 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2328 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye972 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye834 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye733 personBudhi Firmansyah Surapati